Vocational Training Center Rottweil – 7th construction phase: Reconstruction and extension
Competition for realization 2014, 1st prize, with Kienleplan GmbH (landscape architect)
Hugo Häring Award 2020, District Group Schwarzwald Baar Heuberg, BDA (Bund Deutscher Architekten)
Selected for the exhibition „da! Architektur in und aus Berlin“ 2020 of the Berlin Chamber of Architects
Performance period: 2014-2019
Service phases: 1-9
GFA: Existing building: 2,542 m² Extension: 1,640 m²
Client: District Office Rottweil
Pictures: Brigida González, Stuttgart
In the 7th construction phase, the entire ensemble was functionally and creatively rearranged by the extension of the existing building with a new event and dining hall area with a multifunctional hall with 400 seats as well as rooms for independent work.
Common areas, school library, PC bar, rooms for seminars, classes and preparations and parts of the administration were restructured and further developed. The new interior design concept will be used as a design model for all further conversion and redevelopment measures.
The central idea of the design is to continue the urban development of the building ensemble of the school center and to integrate the existing architectural qualities into the new concept called “New Center”.
The building extension with the public uses of the school center sets a new architectural urban accent as a “Glass Pavilion Sculpture at the Bastion”.